troutguy 0 Report post Posted December 9, 2022 Contractor I know was talking about the problem of mobile homes and some manufactured homes was, as he put it, “what is behind door number two?” Said he started a job, pulled paneling and it was basically veneer covered cardboard. The owner told him he broke it, he bought it. The quote and intent was to remove, do repair an reuse. Headers, studs, etc didn’t match standard construction. He said it was a nightmare. Quote Share this post Link to post Share on other sites
flytire 0 Report post Posted December 9, 2022 yes but how old was the home? Quote Share this post Link to post Share on other sites
flytire 0 Report post Posted January 11 after a 12 week wait to get my new storm doors replaced, today is the day Quote Share this post Link to post Share on other sites
RickZieger 0 Report post Posted January 11 Whoopee!!!!!!! Rick Quote Share this post Link to post Share on other sites
flytire 0 Report post Posted January 12 one done yesterday the other one today Quote Share this post Link to post Share on other sites
cphubert 0 Report post Posted January 12 5 hours ago, flytire said: one today just in time for the snow Quote Share this post Link to post Share on other sites
chugbug27 0 Report post Posted January 12 If it was New Orleans, both storm doors would be and remain half finished and you wouldn't be able to use either door, and they'd blame it on problems caused by the last tradesman you used, and then tell you it will cost more than expected to finish the job because of it, which you decide to do for yourself and realize after finishing that you should have just done that to begin with. Quote Share this post Link to post Share on other sites
chugbug27 0 Report post Posted January 12 Just kidding (kinda). Congrats on getting that done Quote Share this post Link to post Share on other sites